Independent rate reference - not affiliated with any utility or energy supplier. Data: EIA Electric Power Monthly, June 2026.Full disclaimer
ElectricityRatePerKWh

Modesto Irrigation District Electricity Rate per kWh (2024 EIA Data)

Political Subdivision|EIA utility 12745|California|Bundled

In 2024, Modesto Irrigation District's residential customers paid an average of 21.78 cents per kWh: $219 million of revenue over 1.01 million MWh of sales across 103,650 bundled residential customers, as reported to EIA on Form 861.

Residential 2024
21.78¢
per kWh, bundled
vs CA avg 2024
-31.9%
state 31.97c
Bundled res. customers
103,650
133,517 all sectors
Rank in CA by res. accounts
#8 of 35
1.2% of state residential MWh

How the 21.78c figure is calculated

21.78c/kWh = $218,925k revenue / 1,005,119 MWh x 100. This is EIA's average realised price for 2024: everything Modesto Irrigation District billed its residential customers (energy, delivery, fuel and rider charges, fixed charges) divided by the kilowatt-hours it sold. It is not a tariff rate, and a 2024 annual average will differ from a current bill. For a 1,000 kWh month at this average, the energy cost works out to about $218 before taxes.

About Modesto Irrigation District's 2024 electricity prices

Modesto Irrigation District is a public power district or political-subdivision electric utility that reports to the U.S. Energy Information Administration under utility number 12745. In 2024 it served 103,650 bundled residential customers in California, and its average realised residential price was 21.78 cents per kWh: $219 million of residential revenue divided by 1.01 million MWh of residential sales.

Across the other sectors, Modesto Irrigation District's 2024 average prices were 17.16 cents for commercial customers (29,728 accounts) and 12.26 cents for industrial customers (139 accounts). Industrial customers paid 9.52 cents less per kWh than households, a 44% discount that is typical of high-volume, high-voltage service.

Within California, Modesto Irrigation District ranked number 8 of 35 utilities with bundled or delivery service by residential accounts served (103,650) and accounted for 1.17% of the state's residential electricity sales in 2024, measured in MWh sold or delivered rather than in customers. The state-wide average realised residential price in 2024, computed from the same EIA file, was 31.97 cents per kWh, so Modesto Irrigation District's customers paid 10.19 cents below the California average (-31.9%). For context, EIA's latest monthly figure for California is 34.74 cents per kWh (June 2026, Electric Power Monthly); that is a different, more recent measure across all utilities and is not directly comparable with a 2024 annual average.

EIA's service-territory file places Modesto Irrigation District in 2 California counties: San Joaquin and Stanislaus. On the grid side it operates in the WECC NERC region and the CAISO (California ISO) market, and reported generation, transmission, buying transmission, distribution, wholesale marketing, retail marketing, and bundled as its activities. Balancing authority code: BANC.

Modesto Irrigation District is not among the utilities included in EIA's preliminary 2025 early release, so the 2024 final data is the most recent figure available for it.

The nearest other utilities in California by service-territory centroid are City of Lodi (CA) (14.8 miles away, 22.47 cents), Pacific Gas & Electric Co. (30.3 miles away, 39.62 cents), Turlock Irrigation District (33.2 miles away, 16.34 cents), Alameda Municipal Power (42.9 miles away, 22.98 cents), and Merced Irrigation District (44.5 miles away, 24.25 cents).

2024 sales by sector in California (bundled service)
SectorCustomersSales (MWh)Revenue ($k)Avg c/kWh
Residential103,6501,005,119218,92521.78
Commercial29,728855,244146,78817.16
Industrial139808,92999,16712.26

Counties served in California (2)

San JoaquinStanislaus

From the EIA-861 Service Territory file; a listed county can be served in part only.

Nearby and comparable utilities in California

City of Lodi (CA)Municipal, 14.8 mi between territory centroids
23,751 res. accounts 22.47c
Pacific Gas & Electric Co.Investor Owned, 30.3 mi between territory centroids
5,047,461 res. accounts 39.62c
Turlock Irrigation DistrictPolitical Subdivision, 33.2 mi between territory centroids
80,575 res. accounts 16.34c
Alameda Municipal PowerMunicipal, 42.9 mi between territory centroids
33,174 res. accounts 22.98c
Merced Irrigation DistrictPolitical Subdivision, 44.5 mi between territory centroids
11,366 res. accounts 24.25c
EIA-861 facts, 2024
EIA utility number
12745
Ownership type
Political Subdivision
Data year
2024 final (EIA-861)
Primary state
California
Service type
Bundled (Part A)
Bundled residential customers (CA, price basis)
103,650
Residential accounts served (CA)
103,650
All accounts, all sectors (CA)
133,517
Residential price, 2024
21.78 c/kWh
Commercial price, 2024
17.16 c/kWh
Industrial price, 2024
12.26 c/kWh
Residential sales
1.01 million MWh
Residential revenue
$219 million
Rank in California by residential accounts served
8 of 35
Share of California residential sales (MWh, not customers)
1.17%
California average, 2024
31.97 c/kWh
Counties served (CA)
2
NERC region
WECC
RTO / ISO
CAISO (California ISO)
Balancing authority
BANC
Reported activities
Generation, Transmission, Buying Transmission, Distribution, Wholesale Marketing, Retail Marketing, Bundled
Registry status
Reported on Form EIA-861 for 2024
California today
Residential (June 2026)34.74c
Commercial27.33c
Industrial20.74c
California electricity rate page ->All utilities in California ->
Energy cost at 21.78c
500 kWh$108.90
750 kWh$163.35
1,000 kWh$217.80
1,500 kWh$326.70

Realised price times usage; fixed charges are already inside the average. Bill calculator ->

Check your own bill

Annual averages hide seasonal and tariff differences. Diagnose a high bill or model time-of-use pricing.

Bill Diagnostic ->Time-of-Use Guide ->
Source and method

Source: U.S. Energy Information Administration, Form EIA-861 Annual, 2024 final data (public domain), retrieved 28 August 2026; prices are average realised revenue per kWh, not tariffs. Final 2024 file f8612024.zip (released 3 December 2025) from the EIA-861 detailed data files. Preliminary 2025 figures come from the early-release file f8612025er.zip (4 August 2026), which EIA has not yet validated; they are labelled as such wherever shown and never mixed into a final figure.

Method: cents per kWh = revenue (thousand dollars) divided by sales (megawatthours), times 100. Customer counts, sales and revenue are the utility's own annual survey responses by state and sector. Bundled = energy plus delivery from one utility; delivery-only = the wires charge for customers who buy energy from a competitive supplier; energy-only = a competitive supplier's energy charge without delivery. County lists come from the EIA-861 Service Territory file; territory centroids used for "nearby utilities" are unweighted means of Census 2023 county centroids. EIA content is in the public domain (EIA copyright and reuse statement); the EIA logo is not used. Corrections: [email protected].